Purlwise
Short Row Heels

PreviousPrevious HomeHome NextNext

yarn over knit 1

Once you've worked the purl row up to the next yarn-over on the left needle, you'll work a SSSP using the next three stitches on the left needle.

Slip the next three stitches on the left needle onto the right needle one at a time knitwise. Slip all three stitches back to the left needle now that the stitch mounts have been switched.

The picture shows the three slipped stitches sitting on the right needle. These stitches are then slipped back to the left needle.

Page 10 - Purl Side
Purlwise copyrighted © 2004 by Melinda Mullins. All rights reserved.